UTHM Conference Portal, International Conference on Mechanical and Manufacturing Engineering (ICME2015)

Font Size: 
The Improvement of Line Efficiency on Disassembly Line Balancing Problem: An HRRCD’s Heuristic Rule
Yeoh kim hao

Last modified: 2015-08-18

Abstract


Disassembly line balancing problem (DLBP) is the factor of remanufacturing industry to improve their effectiveness on part demand. The application of HRRCD’s (Hazard-Reuse-Recycle-Collected-Disposed) heuristic rule will solve the problem of disassembly line by improving the line efficiency and reducing balance delay. A case study from truck’s remanufacturing industry will apply the heuristic rule, which it will improve disassemvly line efficiency and decline idle time.


Keywords


disassembly line balancing, idle time, line efficiency, balance delay